Project Overview This existing 9 foot diameter corrugated metal pipe (CMP) was corroding or rusting through the invert or base of the pipe. At some points, water was just beginning to undermine the culvert forcing the township to take some action or risk affecting the roadway embankment potentially forcing an unscheduled replacement of the culvert. […]