CASE STUDIES

Photo: Milliken

Levee Slope Protection

Project Overview After an inspection in early 2016, a flood protection levee along the Little Calumet River was

Levee Slope Protection

November 8, 2016

Case Studies, Storm & Sanitary

Project Overview After an inspection in early 2016, a flood protection levee along the Little Calumet River was found to be out of compliance with the United States Army Corps of Engineers (USACE) Levee Safety Program. In order to be recognized by the Federal Emergency Management Agency as a certified

Diversion Ditch for an Underground Mine

Project Overview In August of 2016, 11,125 sq. m’s of Concrete GCCM 8mm (CC) was used as a

Diversion Ditch for an Underground Mine

August 20, 2016

Storm & Sanitary

Project Overview In August of 2016, 11,125 sq. m’s of Concrete GCCM 8mm (CC) was used as a protective liner for a large diversion ditch at an underground zinc and copper mine on Central Vancouver Island in Canada. The diversion ditch, which conveys clean water from the hillside above to

Culvert Invert Protection

Project Overview The Ohio Department of Transportation’s (ODOT) Office of Hydraulic Engineering had interest in utilizing Combat Concrete

Culvert Invert Protection

May 12, 2016

Case Studies, Storm & Sanitary

Project Overview The Ohio Department of Transportation’s (ODOT) Office of Hydraulic Engineering had interest in utilizing Combat Concrete in a culvert lining/protection demonstration project. Concrete GCCM would be used as a substitute to the ODOT standard practice of field paving an invert with 3-inch-thick reinforced concrete. The Administrator for the

Drainage Swale Lining

Project Overview The facility is located in extremely difficult dry, windy climate where vegetation is hard and expensive

Drainage Swale Lining

March 12, 2015

Case Studies, Storm & Sanitary

Project Overview The facility is located in extremely difficult dry, windy climate where vegetation is hard and expensive to maintain. However when precipitation does occur, runoff water must be managed correctly otherwise significant erosion and water quality issues can occur. The facility has been experiencing erosion in their drainage areas

Berm Protection

Project Overview Asphalt–emulsion had been used for years as a hard armor berm protection for a secondary containment

Berm Protection

October 12, 2014

Case Studies, Oil, Gas & Industrial

Project Overview Asphalt–emulsion had been used for years as a hard armor berm protection for a secondary containment system at a tank terminal site in Washington. Industry safety protocols state that berms must maintain a minimum height in order to provide an effective secondary containment and must be maintained at

1 2 3 4 Next
Amplified Concrete Solutions Global

ACSG (Amplified Concrete Solutions Global) is a US Veteran founded construction and manufacturing firm that manufactures highly transportable, rapidly deployable concrete infrastructure solutions for contingency and remote industrial environment.

HOME | ABOUT US | PRODUCT SOLUTIONS | SHOP | OUTREACH | CONTACT US | PATENT & TRADEMARK INFO

© Copyright - ACSG (Amplified Concrete Solutions Global)